This capital buys and runs Proto 10, a dry plasma separator, and takes the first-light measurement. The machine separates elements and fission products. Hardware is specified and not purchased. Nothing has been measured.
The raise is one bench measurement. The other machines stay on the shelf as designs.
A DOE application for an INTEC demonstration was submitted on 19 June 2026. It is under review. It is not an award.
Proto 10 is the first measurement instrument. It is specified. It is not purchased. Nothing has been measured.
Titanium remelt, mine-water cleanup, and a flywheel are design packages. They are not what this capital builds.
No separation factor has been measured. Patent pending.
19 U.S. provisional applications. Patent pending. The models can change. The hardware is not built.
A dry plasma separator. An alpha instrument. Not a production plant.
It separates elements and fission products. Nothing has been measured.
Specified
Not purchased
Not measured
Not a reactor
Same physics framework. Not purchased. Not what this capital builds.
A design package for scrap to ingot. It is not in fabrication. No production contract is signed.
A design for a small cleanup skid. No pilot workplan is signed.
A counter-rotating storage design. No national-lab validation program is engaged.
Design packages only. Not in fabrication. No production contract is signed.
No machine is offered for sale. No pilot revenue is booked. No customer has taken delivery.
The DOE application is under review. It is not an award. The company has no federal award.
Field hardware has not been demonstrated. The measurement comes first. No date is promised.
Evidence grades are earned, not claimed.
Capital buys and runs this separator and takes the first-light measurement. No product is for sale from that measurement.
Design models cover storage, separation, melt, critical minerals, and a reactor study. The reactor study is not this raise. The models are not built machines.
Nineteen U.S. provisional applications. Patent pending.
| 19 U.S. provisional applications | Filed · patent pending |
| SAM.gov registration | Active · CAGE 22X96 |
| DOE INTEC application, submitted 19 June 2026 | Under review · not an award |
| Proto 10 hardware | Specified · not purchased |
| Nevada site conversations | In progress |
| Field-demonstrated hardware | Not yet — the measurement comes first |
A DOE application to demonstrate recycling at INTEC is under review. Selection would not be an award of funds. Nothing has been selected.
Element and fission-product separation is the work. This company has not measured it. The gap is real. The machine is not.
Proto 10 is a bench instrument. It is not a production plant, and it is not a reactor.
A sequence. Not a promised date.
The specification is written. The axial-field coil, rotating-field drive, vacuum system, and diagnostics are not purchased.
Buy that hardware. Assemble the bench. Commission it. No product leaves the building.
Take the first-light measurement. No date is promised. The result is earned on the bench.
A planning sequence for this separator. Not a budget. No dollar figure.
Purchase the specified Proto 10 hardware. It is not purchased today.
Build the bench and commission the vacuum system and diagnostics.
Take the first-light measurement. No date is promised.
The result sets the next step. No product revenue is assumed.
Investor materials on request. No instrument is stated on this page.
Raising capital to buy and run this separator and to take the first-light measurement.
This page is the short deck. The technical package is under NDA.